My condominium board hired a contractor to paint and repair my building. It took almost two years to complete the project, and my unit had significant damage during that period. The construction crew started out by covering the units they were working on to protect the nearby units from possible damage. By the time they reached mine, the work was sloppy and quickly done. They even protected the wrong unit!
The damage to my unit included missing tiles, the floor of the
balcony contractor los angeles was chipped in 15 places, and the windows had paint on them. When the plastic was removed from the window edges, there was permanent damage to the surface. There were huge cracks in the cement surrounding one window and a large section of the railing that did not have paint.
I complained to the manager and made a list of the damage for the condominium board. Even with the list, the contractor did another bad job. The manager had already signed off on the repair work. I wrote to the condominium board. They never wrote back. This happened during the summer of 2007. I then had to return to school, my children to college, and attend to very ill parents.