Information
Category: Sports
Tags: #ECCA Manufacturer
-
Last updated August 22, 2019
- 0 comments, 1 view, 1 like, 0 followers, 1 member
You May Also Like
Social Share
Info
Basic Information
-
Posted By:
xiu weetime
-
Posted:
Aug 23, 2019
-
Last Updated:
Aug 23, 2019
-
Members:
1
-
Views:
1
-
Likes:
1
Category:
Sports
Tags:
#ECCA Manufacturer
Description:
1. First item inspection
The first inspection of the ECCA Wire(XINYU) http://www.xinyu-enameledwire.com/
should be very important. It is very important to find problems at the beginning, to deal with problems, to develop preventive measures, and to avoid batch failure. For example, a worker opens... more1. First item inspection
The first inspection of the ECCA Wire(XINYU) http://www.xinyu-enameledwire.com/
should be very important. It is very important to find problems at the beginning, to deal with problems, to develop preventive measures, and to avoid batch failure. For example, a worker opens the extruder in the morning, and when the temperature of the heating reaches, he starts to consume. Then this is the first piece of inspection, to check whether the temperature of the extruder has reached the regular temperature, the gloss of the discharged material, the presence or absence of colloidal particles, the non-plasticized particles, etc. If so, clarify that the holding time is not enough, this When the machine is turned on, it will inevitably lead to quality problems. When you find a product that is not suitable, you should analyze it and develop preventive measures. Regarding the first piece inspection, it can be introduced into self-inspection, mutual inspection and special inspection. Then, regarding the above three tests, I think that the self-inspection is the probability that the operator inspection is more dangerous than the special inspection, and there are many production machines in the workshop. It is impossible to each. The special inspections are all in place. At this time, the self-inspection should play the role of its position, which is also the gateway to prevent the inflow of non-products into the next process. But often the opposite is true. The inspection relies on the special inspection personnel. This is also a bad concept. The quality is the participation of all the people involved. It is not the obligation of that person. It is the duty of everyone. The progress of quality is established in the norm. Understand the level and the sensitivity of the application, everyone can be a quality inspector, change the concept, the problem will be solved.
2. Circuit inspection
The patrol inspection is the full inspection of the quality inspection process by the quality inspector. It is thought that the inspection of important processes and data enhancement frequency can be carried out at a time. It is necessary to urge the operators to familiarize themselves with the ECCA wire production process rules and check the execution status. If the inspection is not timely, a batch failure will also be formed.
3. Completion inspection
Completion inspection is a test method for a semi-disposable ECCA wire, and it is verified whether the ECCA wire meets the request rule.
Click ECCA Manufacturer http://www.xinyu-enameledwire.com/
to learn about more information. less
Share