This website uses cookies to ensure you get the best experience on our website.
To learn more about our privacy policy Click hereHydraulic Adapters Factory introduces the installation requirements of high-strength bolt joints:
1. Install the pillar and beam support at the re-temperature. Correction should be carried out when waiting for a large construction, and the permanent fixation can be carried out only after the correct position is corrected.
2. The construction installed on the day should form a space-stable system.
3. The friction surface of high-strength bolt joints should be clean when installed, and there should be no snow and ice.
4. On the surface of the bolt, neither Yulin nor remove the soil, whether there is any other stolen goods.
5. When installing multi-layer steel structures, the load piled on the floor should be limited, and the quality of the construction cargo on the ground snow and ice should not exceed the load-bearing capacity of the steel plate and stairs.
Through the above introduction, Metric Thread Fittings Wholesalers hopes that you can simply refer to the content of this article in future use.
Comments