Lay Out the Axle Assembly Line In These Steps

More from ri mei

  • Optimize Alternaror Assembly Lines As Such
    0 comentarios, 0 likes
  • Do You Know How To Reinvent the Alternator Assembly Line?
    0 comentarios, 0 likes
  • Features of the Modern Starter Assembly Line
    0 comentarios, 0 likes

More in Politics

  • Norton antivirus account login
    31 comentarios, 144.907 vistas
  • Liquidity Locking Made Easy
    10 comentarios, 83.136 vistas
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comentarios, 46.593 vistas

Related Blogs

  • How to get varicose vein treatment and insurance?
    0 comentarios, 0 likes
  • Water Infiltration Issues in the USA: Causes and Solutions
    0 comentarios, 0 likes
  •  How The Extreme Utilization Of Computerized Marketing Influences The Nature Of Leads\u00a0
    0 comentarios, 0 likes

Archivo

compartir social

Lay Out the Axle Assembly Line In These Steps

Publicado por ri mei     10 de noviembre de 2020    

Cuerpo

   1. The flow of axle assembly line logistics and transportation materials is completed by transportation. Material transportation is essential in the factory, and we should choose an economical and reasonable transportation method. It can be concluded that the amount of material movement depends on its production factors. The assembly line layout must ensure the shortest material flow distance, and always flow to the end of the product line, and establish a control system to ensure the flow of materials.

  2. The material flow of warehousing and auxiliary facilities always flows to the end of the assembly process, but whenever the material is interrupted, there will be a production stop. Therefore, it is necessary to keep a certain amount of reserves to ensure the flow of material flow on the assembly line, which is economical and reasonable in terms of maintaining production and balancing process capacity. In addition, auxiliary equipment also plays an important role in providing maintenance and services for production.

  3. Plant structure Once the plant is established, its variability is relatively small, so it should be carefully considered during design and the plant structure should be determined according to the production characteristics. If there are special requirements in the assembly process, the workshop shall be specially designed. Generally, general-purpose factory buildings should be adopted, and multi-storey factory buildings should be comprehensively considered according to the characteristics of assembly line layout and land occupation.

Welcome to send us messages if you are interested in automatic assembly testing machine or other products!

Comentarios

0 comentarios