Ball Valve Manufacturers Introduces The Knowledge Of Handling Failures Caused By Process And Design
  • الكلمات - #Ball Valve
    • آخر تحديث ٧ أبريل، ٢٠٢٢
    • تعليق ٠ , ٢٠٨ views, ٠ مثل

More from hongge yeya

  • Bkh Ball Valves\/bkh3k Ball Valves Manufacturers Introduce The Selection Details Of Electric Ball Valves
    تعليق ٠ , ٠ مثل
  • China Mining Ball Valves Company Introduces The Use Process Of High Pressure Ball Valve
    تعليق ٠ , ٠ مثل
  • Flange Ball Valve Manufacturer Introduces The Installation Method Of Safety Valve
    تعليق ٠ , ٠ مثل

More in Politics

  • Norton antivirus account login
    ٣٢ comments, ١٦٦٬٨١٧ views
  • Liquidity Locking Made Easy
    ١٤ comments, ٨٧٬٧٢٦ views
  • USE VADODARA ESCORTS SERVICE TO REST YOUR BODY AND MIND
    تعليق ٠ , ٦٩٬٤٢٢ views

Related Blogs

  • Prepare for the New Threats in Helldivers 2: What Players Need to Know
    تعليق ٠ , ٠ مثل
  • Exploring the Evolution of Fishing Rod Materials: From Bamboo to Graphite
    تعليق ٠ , ٠ مثل
  • C\u01b0\u1ee3c T\u1ef7 S\u1ed1 Ch\u00ednh X\u00e1c l\u00e0 G\u00ec? T\u1ea1i Sao N\u00f3 H\u1ea5p D\u1eabn T\u1ea1i UU88?
    تعليق ٠ , ٠ مثل

أرشيف

حصة الاجتماعي

Ball Valve Manufacturers Introduces The Knowledge Of Handling Failures Caused By Process And Design

منشور من طرف hongge yeya     ٧ أبريل، ٢٠٢٢    

الجسم

Ball Valve Manufacturers introduces the failures and countermeasures caused by process and design:

common error

1) The valve cannot operate due to the change of process parameters, which causes the pressure difference in the pipeline to be too large.

2) The valve body is fouled due to the medium, causing the valve to act abnormally.

3) The valve cannot operate normally due to the blockage of the pipeline.

4) Due to the design and selection, the actuator is too small, the torque is not enough, the valve cannot operate normally, and the valve body material is not suitable, resulting in damage to the valve body.

Cause countermeasures

1) The pressure difference is too large, so that the control valve cannot be opened normally. Treatment method: install a bypass valve before and after the control valve.

2) The control valve cannot be opened normally due to the scaling of the valve body due to process reasons. Treatment method: increase the flushing water pipe, disassemble the valve regularly to clean the valve body, and polish the valve core if necessary.

3) The control valve cannot operate due to the blockage of the pipeline. Treatment method: optimize the operation method, try not to block the pipeline, and disassemble the pipeline flushing valve.

4) About design selection. Treatment method: try to optimize various process parameters in the design stage to ensure that there will be no problems in selection due to inaccurate process parameters.