China 2 Gang Switch
    • Last updated March 6, 2023
    • 0 comments, 111 views, 0 likes

More from mredh222 mredh222

  • Buy Fold Flat Disposable Respirator
    0 comments, 0 likes
  • Wholesale Slurry Pump Liner
    0 comments, 0 likes
  • cheap Fat Tire Electric Bike
    0 comments, 0 likes

More in Politics

  • Norton antivirus account login
    31 comments, 146,254 views
  • Liquidity Locking Made Easy
    10 comments, 83,404 views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comments, 46,685 views

Related Blogs

  • Richtlinien zum Kauf von Windows beim Umbau Ihres Hauses
    0 comments, 0 likes
  • Increase Your Business Growth By Hiring SEO Company
    0 comments, 0 likes
  • Anxiety in Focus: Root Causes and Modern Approaches to Management
    0 comments, 0 likes

Archives

Social Share

China 2 Gang Switch

Posted By mredh222 mredh222     March 6, 2023    

Body

China 2 Gang Switch Product Introduction With advantage of excellent ability of designing and modeling,base on good management and real qualified talents, responsible stuff who are building our company, we are utmost follow the steps of international master. We review and update our goods ranges whatever and wherever possible ad customers need. If you are interested in our products,we are the leading company specialized in producing wall switch&socket with more thank 20 years of experience.Our competitive price and good quality will not let you down! Model No.JB11Y Item No.2 gang 1 way switch Power/Voltage15A125V/16A 250V CertificationISO9001,CE Carton Size43*35*24 Package1PC/plastic bag, 10PCS/inner box, 100PCS/CTN ColorWhite/Customized colors MOQ1000PCS Payment termTT/LC Delivery time20-25days after receiving deposit SeaportNingbo/Shanghai HS code8536500000 OriginChina Packing Shipping Certification Workshop Showroom FAQ 1.Q:Are you making molds of products by yourself? A:Yes, we are. We have our own molds making workshop, so if you want us to do some special design goods, our mold engineer will make the drawing 3D printed sample for you according to your request. 2.Q:What is your delivery time for this order? A:Normally our delivery time is 20-25 days, but if we have stock in our warehouse, the delivery time will be two weeks or less. 3.Q:What Certification have you obtained? A:We have obtained ISO,CE,CB certification etc. 4.Q:Can you according to the sample? A:Yes,we will send to you the drawing before placing the order. 5.Q: How to ship the package? A:Our product can be shipped by air/sea/express(EMS, UPS, DHL, Aramex, Fedex, etc).China 2 Gang Switch website:http://www.gxt-switchs.com/wall-switch/2-gang-switch/

Comments

0 comments