We must work hard to break through the bottleneck faced by prefabricated houses

More from zhou zhou

  • How to choose the mattress of the elderly\uff1f
    0 comments, 0 likes
  • Sandwich mattress fabric,walk into a healthy sleep
    0 comments, 0 likes
  • Is your mattress really defensive?
    0 comments, 0 likes

More in Politics

  • Norton antivirus account login
    26 comments, 123,909 views
  • Liquidity Locking Made Easy
    9 comments, 80,997 views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comments, 45,287 views

Related Blogs

  • Top-Quality A\/C Repair Services | What to Expect from Experienced Technicians?
    0 comments, 0 likes
  •  NBA Live Mobile as meaningful being a being an NBA All-Star
    0 comments, 0 likes
  • From Homes to Offices: The Increasing Need for Plywood in Hyderabad's Architecture
    0 comments, 0 likes

Archives

Social Share

We must work hard to break through the bottleneck faced by prefabricated houses

Posted By zhou zhou     December 20, 2018    

Body

China prefabricated houses also face some challenges while gaining opportunities. Let's briefly analyze it:

1. Bottlenecks in the early stage of cost increase

The fundamental reason for the increase in initial construction costs is that the company has not yet fully mastered the technology, has no professional team and skilled workers, and has not established a modern enterprise management model. The company has made these preparations and the cost will naturally fall.

2. The bottleneck of the industry management system

The incompatibility between the industrialized production mode and the current management system is a reality of development. The design, production, construction, supervision and other links are all shifted, and the scope of the main responsibility will change.

3. The bottleneck of the management mechanism of construction enterprises

The traditional enterprise operation management model is deeply rooted, and the management mode of individual warfare, escrow, and subcontracting severely restricts the development of industrialization and must be broken.

4. The bottleneck of the interest chain in the process of production activities

The traditional production mode has already formed an inherent interest chain, and a new benefit distribution mechanism should be formed under the general contract management mode.

PTH is a national level high-tech enterprise, and it attributes its success to continuous focus on innovation of new products and technology. It has exported its products to over 100 countries and regions, with more than 2000 progects.

If you want to know more, you can click here: low cost prefab houses.

Website: https://www.pthhouse.com/

Comments

0 comments