Introduction To The Use Of Drill Pipe
  • الكلمات - #Tapered Bit #Drill pipe
    • آخر تحديث ٢٦ مايو، ٢٠٢١
    • تعليق ٠ , ١٢٦ views, ٠ مثل

More from drilling kaiqiu

  • The Shank Adapter For Top Hammer Is Easy To Use
    تعليق ٠ , ٠ مثل
  • What are the use characteristics of the Shank Adapter
    تعليق ٠ , ٠ مثل
  • Where To Check The Extension Drilling Tools
    تعليق ٠ , ٠ مثل

More in Politics

  • Norton antivirus account login
    ٢٧ comments, ١٢٧٬٣٩٤ views
  • Liquidity Locking Made Easy
    ٩ comments, ٨١٬٢٨٩ views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    ٢ comments, ٤٥٬٤٧٨ views

Related Blogs

  • Orange Hair Extensions
    تعليق ٠ , ٠ مثل
  • How To Use Top Hammer Drilling Tools
    تعليقات ١, ٠ مثل
  • Smart Fragrance Box Market Report 2023 | Industry Size, Share, Growth, Trends, End Users
    تعليق ٠ , ٠ مثل

أرشيف

حصة الاجتماعي

Introduction To The Use Of Drill Pipe

منشور من طرف drilling kaiqiu     ٢٦ مايو، ٢٠٢١    

الجسم

        Entry inspection of Tapered Bit:

 

      (1) Check whether the screw drill bypass valve piston is flexible;

 

      (2) Turn on the pump. Start with a small displacement, and then gradually increase to the normal displacement. Check whether the bypass valve is closed, the brand of the screw drill disassembly rack, and whether the mandrel rotates flexibly.

 

      (3) Lift up the drilling tool and check the bypass valve closing condition. Only after everything is normal, can the drilling be carried out.

 

      (4) During the drilling process, it is necessary to operate smoothly and control the lowering speed. The screw drilling tool disassembly frame is generally suitable for investment, generally 10m/min, to prevent the drill bit and the screw drilling tool from being blocked by the stolen material. During the drilling process, the water hole on the top of the pump can be properly opened, and the Drill pipe disassembly frame should be added, but the time should not be too long, or the clean well flushing fluid should be poured into the drill string every 500 meters.

تعليقات

تعليق ٠