You Need To Know General Requirements For Installation of Pe Fitting

More from fitting Tony

  • Do You Know How To Select the Proper Push to quick fitting\uff1f
    0 comments, 0 likes
  • Have You Ever Learned Custom pe fitting Fabrication Services
    0 comments, 0 likes
  • Have You Ever Heard Of Single And Double Ferrule Pe Fittings?
    0 comments, 0 likes

More in Politics

  • Norton antivirus account login
    27 comments, 127,144 views
  • Liquidity Locking Made Easy
    9 comments, 81,271 views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comments, 45,466 views

Related Blogs

  • NIGERIA: MT4 FEASIBILITY AND APPLICATION \t
    0 comments, 0 likes
  • What is Ballysports.com\/activate code? How to Activate Ballysports.com?
    0 comments, 0 likes
  • https:\/\/www.facebook.com\/people\/Joyce-Meyer-Keto-Gummies\/100087946723273\/
    0 comments, 0 likes

Archives

Social Share

You Need To Know General Requirements For Installation of Pe Fitting

Posted By fitting Tony     June 8, 2020    

Body

1. Before the pe fitting is connected, the pipes, fittings and auxiliary equipment shall be checked according to the design requirements, and the appearance inspection shall be conducted on the construction site to meet the requirements before use. Main inspection items include pressure rating, surface quality, fit quality, material consistency, etc.

2. Special heating tools shall be adopted according to different interface forms, and PE pipes and fittings shall not be heated with open flame.

3. For PE pipes connected by welding, it is advisable to use pipes and fittings of the same grade material. For those with similar performance, they must be tested and qualified before proceeding.

4. PE pipes and fittings shall be connected after they have been placed on the construction site for a certain period of time, so as to keep the temperature of pipes and fittings consistent

5. When connecting in cold weather (below 5 ° c) and windy environment, protective measures or adjustment of connecting process should be taken.

6, PE pipe connection pipe end should be clean, each time the end of the pipe should be temporarily blocked to prevent debris into the pipe.

7. The PE pipeline shall be inspected for appearance after connection, and the unqualified shall rework immediately.

The pp quick connect fitting is one of our products, welcome to your come and purchase!

Comments

0 comments