You Need To Know General Requirements For Installation of Pe Fitting

More from fitting Tony

  • Do You Know How To Select the Proper Push to quick fitting\uff1f
    تعليق ٠ , ٠ مثل
  • Have You Ever Learned Custom pe fitting Fabrication Services
    تعليق ٠ , ٠ مثل
  • Have You Ever Heard Of Single And Double Ferrule Pe Fittings?
    تعليق ٠ , ٠ مثل

More in Politics

  • Norton antivirus account login
    ٣١ comments, ١٤٦٬٥٠٦ views
  • Liquidity Locking Made Easy
    ١٠ comments, ٨٣٬٤٥٢ views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    ٢ comments, ٤٦٬٧٠٣ views

Related Blogs

  •  rsgoldb2c is a trusted Runescape Gold seller
    تعليق ٠ , ٠ مثل
  • What Is Dropshipping And Why Would You Want It?
    تعليق ٠ , ٠ مثل
  • Upgrade Your Sexual Arousal by Using Suhagra 100 Medicine
    تعليق ٠ , ٠ مثل
    $99.00

أرشيف

حصة الاجتماعي

You Need To Know General Requirements For Installation of Pe Fitting

منشور من طرف fitting Tony     ٨ يونيو، ٢٠٢٠    

الجسم

1. Before the pe fitting is connected, the pipes, fittings and auxiliary equipment shall be checked according to the design requirements, and the appearance inspection shall be conducted on the construction site to meet the requirements before use. Main inspection items include pressure rating, surface quality, fit quality, material consistency, etc.

2. Special heating tools shall be adopted according to different interface forms, and PE pipes and fittings shall not be heated with open flame.

3. For PE pipes connected by welding, it is advisable to use pipes and fittings of the same grade material. For those with similar performance, they must be tested and qualified before proceeding.

4. PE pipes and fittings shall be connected after they have been placed on the construction site for a certain period of time, so as to keep the temperature of pipes and fittings consistent

5. When connecting in cold weather (below 5 ° c) and windy environment, protective measures or adjustment of connecting process should be taken.

6, PE pipe connection pipe end should be clean, each time the end of the pipe should be temporarily blocked to prevent debris into the pipe.

7. The PE pipeline shall be inspected for appearance after connection, and the unqualified shall rework immediately.

The pp quick connect fitting is one of our products, welcome to your come and purchase!

تعليقات

تعليق ٠