What To Pay Attention To When Constructing Shank Adapter For Top Hammer

More from drilling kaiqiu

  • The Shank Adapter For Top Hammer Is Easy To Use
    تعليق ٠ , ٠ مثل
  • What are the use characteristics of the Shank Adapter
    تعليق ٠ , ٠ مثل
  • Where To Check The Extension Drilling Tools
    تعليق ٠ , ٠ مثل

More in Politics

  • Norton antivirus account login
    ٣١ comments, ١٤٣٬٥٨٣ views
  • Liquidity Locking Made Easy
    ١٠ comments, ٨٢٬٨٣١ views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    ٢ comments, ٤٦٬٣٧٨ views

Related Blogs

  • Take Advantage Of The Efficiency Of Fiber Closure
    تعليق ٠ , ٠ مثل
  • The Importance of Taking Advantage of Customer Service Statistics and Trends
    تعليق ٠ , ٠ مثل
  • Common Mistakes to Avoid in Email Support: Tips for Providing Effective Customer Service via Email
    تعليقات ١, ٠ مثل

أرشيف

حصة الاجتماعي

What To Pay Attention To When Constructing Shank Adapter For Top Hammer

منشور من طرف drilling kaiqiu     ٦ أغسطس، ٢٠٢٠    

الجسم

Shank Adapter For Top Hammer pilot hole construction operation and matters needing attention:
    1. The water pump for cooling water should be started before drilling. The cooling water should be supplied continuously, and the oil temperature should not exceed the requirements of the operating instructions and operating procedures.
    2. The flushing fluid must be supplied before drilling. During drilling, attention should be paid to the changes in the flow of the flushing fluid flowing out of the hole and the discharge of cuttings. If it is found to be abnormal, deal with it in time.
    3. When opening the hole, the drill rod should be centered with a brazing device, and the hole should be opened with a small pressing shaft and a slow speed. After the drilling depth reaches 0.5 meters, the shaft pressure can be increased as appropriate, and the speed can be increased. After the drilling depth exceeds 3 meters, the drilling can be carried out according to the normal parameters.
    4. Adjust the drilling parameters (weight on bit, number of revolutions) according to the requirements of the construction organization design or operating regulations. When encountering special geological structures, you can appropriately change the drilling parameters based on experience.
 5. Before attaching the drill pipe, the drill must be raised to a height of 5-10 cm from the bottom of the hole to fully clean the hole. The cleaning time can be controlled according to the depth of the drilling at the time. If you are going to stop drilling, you must lift the drill to a safe position.