Rock Button Bits Dust Removal Maintenance

More from drilling kaiqiu

  • The Shank Adapter For Top Hammer Is Easy To Use
    0 comments, 0 likes
  • What are the use characteristics of the Shank Adapter
    0 comments, 0 likes
  • Where To Check The Extension Drilling Tools
    0 comments, 0 likes

More in Politics

  • Norton antivirus account login
    26 comments, 123,815 views
  • Liquidity Locking Made Easy
    9 comments, 80,980 views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comments, 45,279 views

Related Blogs

  • The current state of Mobile application and its history
    0 comments, 0 likes
  • physician near me dubai
    0 comments, 0 likes
  • Choice of Pressure Washer Accessories for Sale
    0 comments, 0 likes

Archives

Social Share

Rock Button Bits Dust Removal Maintenance

Posted By drilling kaiqiu     October 20, 2021    

Body

  1. Water Well Drilling Tools drill pipes need regular maintenance to determine the maintenance cycle, and regular anti-rust and dust-proof treatment.
  2. The use of drill rods should be within the rated drilling distance of the drilling rig, and the matching drill rods should be used according to the technical parameters of the drilling distance.
  3. The geological drill pipe is made by friction welding of special geological drilling pipe for mining geology and its matching joint, so it has good follow-up and high tensile strength, and can be used for conventional drilling and gas discharge. When working in hard rock formations, coal seams or other special environments, the drilling depth must be determined according to the physical properties and parameters of the actual material of the drill pipe.
  4. When the drill rod is used in conjunction with the drill bit, the drill bit should be larger than the diameter of the drill rod under normal circumstances, and the condition of the drill rig and the drill rod should always be paid attention to during the drilling process. In case of stuck drilling, sudden death, etc., stop drilling immediately or drill back slowly to ensure that the drill pipe does not bend or flatten.
  5. When the drill pipe is ventilated or with water, make sure that the drill pipe is tightly connected when drilling. When the drill pipe has seals, such as O-rings, pay attention to the use of the seals. In the event of damage, corrosion, etc., the seals should be replaced in time. After the drilling is completed, the seals are maintained and cleaned.
  6. When drilling, the drill pipe should be tightened manually to ensure a tight fit (thread type). It is not possible to drill directly on the drill rig to prevent damage to the drill pipe.
  7. If the curvature of the drill pipe exceeds the standard requirement or the thread damage causes abnormal operation after use, it should be scrapped or returned to the factory for repair in time.
  8. According to the requirements of the standard, the drilling depth of the drill pipe shall be ensured according to the relevant requirements of geological drilling to prevent the drill pipe from falling off due to the drilling depth reaching the use limit of the drill pipe.
  9. When working in acid-alkali areas, pay attention to the corrosive effect on drill pipes. When drilling is completed, clean the rod surface with clean water in time to remove the corrosion layer.
  10. The drill pipe should be stored in a dry place, and the bottom should be supported at multiple points. The drill pipe should be regularly maintained during long-term storage.
  11. Drill pipes are not allowed to be used as a support platform for heavy tail stacking, and drill pipes are not allowed to be randomly placed under gravel or coal piles or stacked in random.
  12. After Rock Button Bits drill pipe maintenance and rust removal/dust cleaning, the protective cap should be buckled or packed and sealed to ensure that the drill pipe is frequently used and new.

 

Comments

0 comments