Dth Drill Pipe Maintenance Records

More from drilling kaiqiu

  • The Shank Adapter For Top Hammer Is Easy To Use
    0 comments, 0 likes
  • What are the use characteristics of the Shank Adapter
    0 comments, 0 likes
  • Where To Check The Extension Drilling Tools
    0 comments, 0 likes

More in Politics

  • Norton antivirus account login
    31 comments, 144,859 views
  • Liquidity Locking Made Easy
    10 comments, 83,123 views
  • Ang jili178 login ay nagdudulot sa iyo ng mga laro ng slot at karanasan sa laro ng soccer
    2 comments, 46,588 views

Related Blogs

  • Get Soft Now attempted and examined.
    0 comments, 0 likes
  • Best Ways to Get Rid of Dark Spots on Your Face: Effective Tips for Clearer Skin
    0 comments, 0 likes
  • How to Create Single Use Amazon Promo Codes in 2024?
    0 comments, 0 likes

Archives

Social Share

Dth Drill Pipe Maintenance Records

Posted By drilling kaiqiu     November 18, 2020    

Body

Top Hammer Drilling Tools today tells you what are the places that Top Hammer Drilling Tools should check at any time.
   Top Hammer Drilling Tools should be inspected at any time. First, the geological survey, the drilling rig checks the consolidation of the wire rope ends. The content of the wire rope inspection is: the number of safety turns of the wire rope, the selection, installation, and lubrication of the wire rope, the inspection of the wire rope defects, such as the diameter and wear of the wire rope, the number of broken wires in the wire rope, etc.
    Check the pulley system of the coal mine tunnel drilling rig at any time. The main inspection items are: the condition of the pulley body and the transition pulley anti-skipping device. Check the walking system of Shanghai Top Hammer Drilling Tools at any time. The main inspection items are: pile driver pipe running, card board and hook pipe system condition, sleeper laying, etc.
    Keep DTH Drill Pipe repair and maintenance records, and keep detailed records of replacement parts to ensure that the parts are used within the validity period, or to keep track of the next replacement time.

Comments

0 comments